Projects
The NEL Pipeline Project (56” – 440 km – OP 100 bar) connects the “North Stream” Baltic Sea pipeline with the Rehden-Hamburg gas pipeline and the MIDAL pipeline, providing an annual supply of 20 billion cubic metres of gas.
Bonatti has been awarded Sections 6, 7, 8 and 9 for a total length of 135.5 km (31% of the entire pipeline).
Scope of work
Construction: gas pipeline, 56-inch – km 135.5
Related Images