The Project consists in a general upgrade of the 2 Gosps (NC115 & NC186) trough the installation of 5 Vapour Recovery Units and the revamping and upgrade of 1 Reciprocating Compressor and relevant auxiliaries.
The main target of the project is to reduce Gas Flaring recovering it and increasing the production.
Bonatti has been responsible of the overall project Engineering, the Procurement of all the balance of Plant materials (LLI supplied by Client), site installation and assistant to commissioning working with the 2 Gosp in Production and reducing at minimum the Shut Down for Tie-ins activities.
Scope of work
Engineering, Procurement, Installation & Commissioning
Period
2008-2009
Amount
€ 4,500,000