The project consisted of the construction of the 40-inch high pressure methane pipeline running for 124 km from Tengiz to Kulsary.
The gas has been conveyed into the existing distribution system called InterGas Central Asia.
Works included construction, interconnections, tests and commissioning to give the pipeline ready for the start up.
Scope of work
Construction: gas pipeline, 40-inch – km 124
Period
2004-2005
Amount
€ 25,000,000