High Pression Water Reinjection of E2A and OMN77 Stations

 
 

Lump Sum Turn Key (LSTK) Project of two water reinjection Stations on crude oil plants of Hassi Messaoud. The reinjection Station on E2A plant is equipped with 2 pumps of 5 MW, while the OM77 plant includes only one pump of same power. In both stations will be installed water treatment plants for the elimination of suspended solids and hydrocarbon residuals before the reinjection into the oil reservoir.

The water treatment plant includes:

  • hydricyclone separators
  • coolescher filters
  • set of cartridge filters

 

 

 

DETAILS

Country
Algeria

Client
Sonatrach

Activity
EPC Projects


Scope of work
Engineering, Procurement, Construction

Period
2009 - 2012

Amount
€ 30,000,000