Projects
Lump Sum Turn Key (LSTK) of a Power Generation Plant in the existing Sonatrach Oil Plant in Alrar. The station is equipped by 3 turbogenerators GE Frame 5 of nominal power of 20 MW and includes a medium voltage substation and overhead lines connection. The station is powered by two different fuel gases from the existing oil plants.
The Project include:
- GE Frame 5 Turbogenerator (3) located in two turbogenarator buildings
- Fuel gas skids
- Auxiliary facilities and fire fighting system
- HV/MW switchgear station located in a relevant electrical building
- New control room and administration building
Scope of work
Engineering, Procurement, Construction
Period
2009 - 2012
Amount
€ 115,000,000