Extension of Alrar Power Station

 
Alrar_2011_2

Lump Sum Turn Key (LSTK) of a Power Generation Plant in the existing Sonatrach Oil Plant in Alrar. The station is equipped by 3 turbogenerators GE Frame 5 of nominal power of 20 MW and includes a medium voltage substation and overhead lines connection. The station is powered by two different fuel gases from the existing oil plants.

The Project include:

  • GE Frame 5 Turbogenerator (3) located in two turbogenarator buildings
  • Fuel gas skids
  • Auxiliary facilities and fire fighting system
  • HV/MW switchgear station located in a relevant electrical building
  • New control room and administration building

 

 

 

 

DETAILS

Country
Algeria

Client
Sonatrach

Activity
EPC Projects


Scope of work
Engineering, Procurement, Construction

Period
2009 - 2012

Amount
€ 115,000,000