Projects
Revamping project on EPC basis for the substitution of the Control System (retrofit of MKII to MK VI) for the 3 Gas turbine (GE FR3 MS3001) for Power Generation installed in Bouri Platform. The project involves also additional instrumentation installation, the substitution of the Fire Fighting system and of the DC panel of the turbine.
Scope of work
Engineering, Procurement, Construction: revamping project, Power Station Control system retrofit (MK II to MK VI)
Period
2008 - 2010
Amount
€ 4,500,000
See also
Rotating Equipment Installation, Maintenance and Upgrade